Your Trusted Power Partner in Lahore Mansoorah Market, Multan Road, Lahore Open Daily: 9:00 AM – 9:00 PM 0309-7179133 WhatsApp Us Your Trusted Power Partner in Lahore Mansoorah Market, Multan Road, Lahore Open Daily: 9:00 AM – 9:00 PM 0309-7179133 WhatsApp Us
Home Products Brands Services Reviews FAQ Blog Contact

Your Trusted Power Partner in Lahore

WhatsApp Us

UPS Battery Installation & Replacement Service in Lahore — Same Day

Ashraf Battery Service replaces and installs home and office UPS batteries across Lahore on the same day. We bring the correct tubular or deep-cycle battery for your inverter, safely disconnect the old one, connect the new bank with proper lugs and cable, check the inverter’s charging settings, and test the backup before we leave — and we take your old battery in exchange.

Quick summary

  • Same-day UPS battery delivery and installation anywhere in Lahore.
  • Right battery type for your inverter — tubular for long outages, deep-cycle at minimum.
  • Proper connection: correct lugs, tight terminals, series/parallel wiring done right.
  • We set the inverter charge/float voltage for the new battery and test backup time.
  • Old battery taken in exchange. WhatsApp: 0309-7179133.

What we need to know first

Before the rider comes, send us three things on WhatsApp: your inverter make and VA rating (for example 1000VA, 1.2kVA, 2kVA), how many batteries you run now and their type, and how many hours of backup you want. From that we work out the right Ah rating and number of batteries, and bring the correct cable lengths and lugs so the job is done in one visit.

Why the battery type matters more than the brand

A UPS asks a battery for a steady draw over hours, then a slow recharge — the opposite of a car battery’s job. A car-type battery on a UPS often lasts under a year; a tubular battery, built with thick plates for repeated cycling, lasts several years. For anything more than occasional short outages we fit tubular. A good deep-cycle battery is the minimum. We will tell you which makes sense for your usage rather than selling you the most expensive option.

The installation, step by step

  1. We switch off the inverter and mains, then disconnect the old battery negative first, then positive.
  2. The old battery is moved out and set aside for exchange.
  3. The new battery (or bank) is placed on a ventilated surface, off a bare concrete floor, away from heat.
  4. Terminals cleaned, correct-size lugs crimped, cables run for series or parallel wiring as your inverter needs.
  5. Connections made positive first, then negative, and torqued tight — a loose UPS terminal arcs and can melt.
  6. Inverter powered up; we set the bulk/absorption and float charge voltages for the new battery type.
  7. Mains cut to test: we confirm the inverter switches over cleanly and measure the backup on your normal load.

Common mistakes we fix

  • Wrong charge voltage left on the inverter from the last battery — boils the water off or undercharges.
  • Undersized cable or loose lugs — causes voltage drop, heat and short battery life.
  • Battery in a hot, boxed-in corner — we relocate it to somewhere ventilated and shaded.
  • Mixing old and new batteries in one bank — the weak one drags the whole set down; we advise replacing the full set.

Office and clinic UPS

For a workplace where the backup cannot be down during hours, we schedule the swap for early morning, lunch or after closing. If you run a larger bank, tell us and we will bring enough matched batteries so the whole set is replaced together.

After installation

We hand over a warranty card and receipt, and give you the correct charge settings written down in case the inverter is ever reset. For the first full charge, leave the inverter on mains for several hours before relying on the backup. Check the water level monthly on a non-sealed battery, keep the area ventilated, and reduce the load during long outages so the bank is not deeply discharged every day.

Need a UPS battery fitted in Lahore today?

Send your inverter VA, current batteries and desired backup hours — right battery, delivered, wired and tested, same day.

WhatsApp 0309-7179133 Call now

Frequently asked questions

Do you install UPS batteries at home in Lahore?

Yes — same day, anywhere in Lahore. We bring the right battery for your inverter, disconnect the old one safely, wire and connect the new bank, set the inverter charging voltages and test the backup before leaving.

What battery should I use for my home UPS?

Tubular for long or frequent load-shedding — thick plates built for cycling last years. A good deep-cycle is the minimum. A car-type battery on a UPS usually lasts under a year. Send your inverter VA and desired backup hours and we will size it.

Can I add one new battery to my old set?

It is not advisable. A weak old battery drags the whole bank down and the new one ages fast to match it. If the set is old, replace all of them together.

Will you set the inverter charging settings?

Yes. We set the bulk/absorption and float voltages for the new battery type — wrong settings are a common reason batteries keep failing — and write them down for you.

Do you take the old UPS battery?

Yes, in exchange, with the value deducted from your bill. Large tubular batteries are quoted by weight.